From: route@monster.com
Sent: Saturday, April 16, 2016 2:07 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: NSN Construction Manager
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
(Alex) Jorge Ayala North Las Vegas, NV 89031 n Phone:
702.210.0809 n Email: alexayala80@gmail.com Career Goal: Construction Manager
Education & Certifications B.A., Environmental and
Safety, CSN Charleston Campus, Las Vegas, Nevada 2009 OSHA
500 & 510 Department of Labor, Licenses Outreach, Nevada 2009 ·
OSHA Hazardous Waste
Operations & Emergency Response Certification. Also Certified in
Construction Safety, Confined Space Entry ·
Fall
Protection Cert:
JTC 2009 to 2013 Advance Rescue & Instructor Course ·
Fall
Protection Cert:
COMTRAIN Rescue & Tower Climbing Procedures ·
PIM
Certification:
San Diego, CA 2011 ·
ANRITSU: Las Vegas, NV 2011 ·
OSHA
30
Updated 2011 ·
First
AID/CPR
Updated 2011 ·
AT&T
Qualified Equipment Termination Tech: Nokia, Ericsson, ALU and ARGUS (UMTS,
RXAIT, 850 & 1900) ·
Nokia Level 1 LTE-RRU
Install. 2012 ·
Nokia Level 2 LTE-RRU
Commissioning & Integration. 2012 ·
Nokia Level 2 WCDMA/GSM
Manager/Commissioning & Integration 2012 ·
Nokia Level 1 C-RRU Tower
Rigger. 2012
Experience NSN — Phoenix, Arizona Construction
Manager,
06/2012 to Present •
Experience with Installation, Commissioning and Integration. • Maintains TI
equipment related fields in IPM reflecting the solution of the TSSR. Ensures
the correct usage of project tools (IPM) and the data content. Performs tool
audits with TI- suppliers. Tracks all TI-extra work related issues and
reports those to the Market PM. • Owns the DOP process in strong cooperation
with the logistics team. Oversees Market NSN equipment stock. • Responsible
for the timely ordering of all TI equipment and site materials. • Ensures TI
resources are planned properly (quality and quantity) for region and zone.
Provides demand plan for needed implementation teams (Survey, IC&I). •
Responsible for reporting of TI-site progress from “Site Survey” through
“Notice To Proceed” to “Site Acceptance”. • Supports to regional PM to
prepare / update roll-out schedule (IPM). • Owner of TI-documentation
accuracy for site documents within the market. • Quality assurance and
reporting, ensure implementation id performed in accordance with NSN quality
guidelines. • Perform quality audits and maintain quality log in IPM. • Issue
approvals for change requests during duty periods such as cutover windows. Key
results: ·
Successful
last mile delivery of the NSN Modernization solution for T-Mobile. ·
Detailed
knowledge Bill of Materials / deploy regardless of site configuration. ·
Management
of daily field operations including the night cutover bridge ·
Attend
daily and weekly meetings at a market level covering all areas from Quality,
Progress, Logistics and Reporting. Located both in the office and in the
field with strong emphasis in the field. _______________________________________________________________________________________________________ Team Electric — Houston, Texas Construction
Manager,
02/2012 to 06/2012 Key
results: ·
Supervised
multiple sites during construction as well as multiple construction crews.
Able to communicate, knowledgeable with clientele and personnel involved in
any construction build out. ·
Completed
all Closeout documents equipment installs per Ericsson - Sprint
specifications. ·
PIM /
ANRITSU / Fiber testing per clients specs and training personal. __________________________________________________________________________________________________ X3 Management — Las Vegas, nv Construction
Manager,
5/2011 to 12/2011 The
positioned functioned for a growing telecommunications company. Supported the
LTE AT&T build. Hands on working Forman that also supervised
subcontractors and construction team. Oversee financial construction costs
accordance with corporate standards. Constantly looking for ways to
strengthen overall construction performance. Key
results: ·
Served
as a Construction Forman on 26 New Build LTE Projects. Tiger Team/Trouble
Shoot 28 sites for Black & Veatch & completed a New Site Build that
was center of attention located on the Las Vegas Strip / Fashion Show Mall. ·
RF
Cables, jumpers, lacing & rack installations. ·
Managed
site completion QC/HOC’s. ·
PIM and
ANRITSU Testing. Troubleshooting and Client MOP Closeout Requirements. ·
Completed
site builds that played a key role in the due diligence effort that was
crucial to successful LTE launch. ·
Introduced
new business venders for X3 Management. ·
GPS. ·
Relocate/Hot
Slides existing Nokia equipment. ·
Complete
new equipment installation on Nokia, Ericsson, ALU, and ARGUS (Most recent
new equipment installation 11/2011 ATT – Fashion Show Mall). TRI-COM CORP — Phoenix,
AZ
Construction
Manager, 2010
to 2011 Prime
Contractor for AT&T, Cricket – AT&T 850 Overlay UMTS Projects Key
results: ·
Built a
finely tuned construction team, fostering a collaborative environment that
improved productivity, individual accountability and team morale. ·
Delivered
construction build with cost savings. Minimize Home Depot Trips, Zero Punch
Lists. ·
Installation
of fiber and conduit. ·
Lines
and Antenna Install. ·
AC/DC
Power Integrations. ·
Build-Outs
for T-Mobile UMTS Ericsson equipment all over Las Vegas. Setting cabinets,
running power, all tower work, plus ANRITSU sweep to specifications. ·
ATT 850
Cutover Project, Nokia equipment. ·
Responsible
for turnkey installation of cellular base station facilities for major
carriers: ATT, T-Mobile, and Metro PCS. _______________________________________________________________________________________________________ HIGH MAINTANENCE COMMUNICATIONS — Las
Vegas, Nevada Construction
Forman,
2006 to 2009 Successful
2006 year build out for Metro PCS and constantly looked for ways to
strengthen overall financial performance. Key
results: ·
Responsible
for turnkey installation of cellular base station facilities for major
carriers: Sprint, Nextel, AT&T, T-Mobile, and Metro PCS. ·
Ability
to anticipate potential issues and formulate alternate plans of action. ·
Completed
diverse construction installs from electrical, concrete equipment pads, and
fiberglass antenna screen walls. ·
FAA
Tower Lighting System Testing and Installations. ·
Broadcast
work on AM, FM, UHF-TV sites. ·
Microwave
Path Alignment. ·
E911
ETTCS - AT&T. _______________________________________________________________________________________________________ TEK-CON — Las Vegas, Nevada Construction
Manager,
2000 to 2006 Key
results: ·
Led all
phases of construction – New Build and Site MOD’s for Sprint, Nextel,
Cingular, AT&T projects. ·
Site
Safety/OSHA Compliance. ·
Construction/Demolition
projects. ·
Subcontractor/Crew
Supervision. ·
Lines,
Antenna and Microwave Installs. Developed a relationship with Bechtel
during the AT&T build with outstanding site safety and site QC. _______________________________________________________________________________________________________ References are available on request. 1 | Page |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|